The Government of Hong Kong SAR


Sports Centre, Community Hall & Football Pitches
Plover Cove Road Area 1, Tai Po
The project site occupies an area of about 25 100 square metres. It will have indoor heated swimming pool, indoor heated training pool and a Jacuzzi, a multi-purpose arena that can accommodate basketball, volleyball and badminton courts with a seating capacity of about 800, comprising about 400 fixed and about 400 retractable spectator seats; multi-purpose activity rooms and ancillary facilities.

A multi-purpose hall with a seating capacity of 450 with a stage; a stage store room; a stage meeting room; male and female dressing rooms; a conference room; and ancillary facilities. A two 7-a-side hard-surfaced football pitches, each with a covered spectator stand accommodating about 150 people; and ancillary facilities.


Design and Build of Regional HQ cum Ngau Tau Kok Divisional Police Station Kai Tak Operational Base, Kowloon East
The Regional Headquarters and Operational Base cum Ngau Tau Kok Divisional Police Station is an innovative structure and accommodation that occupies an area of about 6,618 square meter.

It comprises a report room, public interface areas, office accommodation, changing and night duties accommodation, dining and recreation facilities, armoury and indoor shooting range, police control room, dangerous good storage facilities, a fuel (petrol and diesel) filling station, covered and uncovered areas for police vehicles of various sizes, and dog kennels among others.
A Primary School in Area 27 and
A Primary and Secondary Schools
Area 101, Tin Shui Wai
ACMV installation consists of zero ozone depletion refrigerant type VRV with heat pump, split type air conditioning systems.

Electrical installation consists of 3 nos. 3,200A L.V. Main Switchboard, lightings and power systems, stage lighting and engineering work, extra low voltage call bell, class changing bell, video door phone, telephone public address, broadcast reception, computer network and earthing and lightning protection system.


Chun Wah Road Indoor Game Hall-Phase 5(Pkg. C)
50 Chun Wah Road, Ngau Tau Kok, Kwun Tong
ACMV installation consists of 2 nos 175 kw cooling capacity DX AHU, 2 sets of 39 kw cooling capacity VRV complete with heat pump, desiccant type dehumidifier, mechanical ventilation and the associated electrical services, fire services and the renovation builders work.